Featured Projects.
OUR WORK
At Solution Construction, Inc., our projects are more than job sites, they are milestones in Miami’s evolving landscape. From iconic commercial developments to vital public infrastructure, our featured projects reflect the scale of our self-performing capabilities and the trust we’ve built across South Florida.
Each project is a testament to our hands-on expertise, where precision, compliance, and relationship-driven service come together to deliver results. Whether it’s a high-profile residential tower, a municipal facility, or a major sports venue, we bring the same level of commitment to excellence by shaping spaces that serve communities today and stand the test of time.
Explore how our work continues to build the foundation of South Florida’s future.
Certified General Contractor License | Underground Utility and Excavation Contractor License | Class V Fire Protection System Contractor License
Broward Health Medical Center.
Solution Construction was engaged for the early works package at the new Broward Health FSED, focusing on site readiness, utility coordination, and environmental controls.
-
Skanska
-
9001 W Oakland Park Blvd. Sunrise, FL 33351
-
Site clearing and demolition, including removal of asphalt, driveways, sidewalks, signage, walls, trees, palms, bollards, and utilities
Building pad preparation, including clearing, import fill, grading, and elevation control for multiple structures
Drainage infrastructure, with installation of exfiltration trenches, HDPE and PVC piping, catch basins, yard drains, and manholes
Water and fire line systems, featuring 2”–8” DIP mains, tapping sleeves, RPZs, backflow prevention, and hydrants
Sanitary sewer installation, with 4”–8” DIP, manholes, laterals, and trench restoration
Crane access and temporary logistics, including crane roads, lime rock base, access paths, and temporary water systems
Concrete and asphalt infrastructure, including sidewalks, curbs, driveways, dumpster pads, and reinforced pavement
Striping and signage, covering ADA spaces, arrows, stop bars, and regulatory signage
Boca Raton Regional Hospital.
This comprehensive redevelopment project encompassed both temporary and permanent roadway infrastructure, supporting phased hospital construction and long-term functionality.
-
Robins & Morton
-
650 Glades Rd, Boca Raton, FL 33431
-
Phased installation and removal of temporary asphalt across four construction phases
Demolition and reconstruction of sidewalks, curbs, and existing utilities, including tree protection and washdown stations
Major drainage infrastructure, including RCP systems, multiple inlet types, French drains, and connection to existing systems
New water mains and valves, spanning 4” to 16” DIP, with tapping sleeves, gate valves, DDCVs, and fire hydrants
Sewer systems installation, including laterals, manholes, and PVC ranging from 6” to 15” with full connections to existing structures
Concrete work, such as sidewalks, drop curbs, ditch paving, and concrete headers
Final restoration, including asphalt milling and resurfacing, road striping, signage installation, and MOT
This project showcases our strength in executing multi-phase hospital infrastructure while maintaining access and operational safety throughout construction.
Jackson Health System.
Solution Construction delivered full underground infrastructure and site development for the Jackson West Campus, supporting a new medical facility with large-scale utilities and critical site grading.
-
Yates Construction
-
2801 NW 79th Ave, Doral, FL 33122
-
Extensive earthwork, including final grading, proof rolling, and preparation of multiple building pads
Parking lot and fire lane development, with excavation, sub-base, lime rock, and asphalt paving
Comprehensive stormwater system, including manholes, inlets, exfiltration trenches, large-diameter HDPE and RCP, and a custom outfall structure with weir and baffle
Complete water distribution network, including 12” DIP mains, turbine meters, backflow prevention, air release valves, and fire line extensions
Fire and domestic water services, featuring hydrants, RPZs, and tapping sleeves with multiple size transitions
Sanitary sewer systems, including offsite connections, conflict structures, manholes, PVC laterals, and trench restoration
Concrete infrastructure, including sidewalks, curbs, decorative paving, and vehicle-rated concrete
Signage and striping, covering crosswalks, parking spaces, stop bars, bicycle lanes, and ADA markings
Baptist Health.
For this inpatient rehabilitation hospital and adjacent parking garage, Solution Construction provided complete underground and surface civil infrastructure from demolition through final grading and striping.
-
Robins & Morton
-
Sunset Drive and SW 62 Avenue.
-
Demolition of existing utilities and hardscape, including asphalt, sidewalks, water/sewer/storm lines, manholes, and curb infrastructure
Site preparation and building pads, with clearing, grubbing, mass excavation, and elevation adjustments across multiple structures
Earthwork and grading, including trench restoration, swales, and green area prep
Storm drainage installation, featuring HDPE pipe, exfiltration trench, Nyloplast inlets, trench drains, and manholes
New water/fire main infrastructure, with 2”–16” DIP, tapping sleeves, meters, RPZs, fire lines, and hydrants
Sanitary sewer, with PVC C-900 laterals and mains, manholes, bypass pumping, and grease trap coordination
Concrete work, including sidewalks, driveways, curbs, headers, and dumpster pads
Final surfacing and finishes, such as asphalt paving, milling and resurfacing, striping, pavers, wheel stops, and ADA-compliant signage
Villa Miami.
Solution Construction was selected to perform the early works and utility infrastructure for the highly anticipated Villa Miami development in Edgewater. The scope spanned multiple phases including garage, tower, off-site, and regional duct bank coordination.
-
Moss Construction
-
710 NE 29 St. Miami, FL 33137
-
Extensive site preparation, including clearing, grubbing, fill import, building pad construction, and early utility support for garage and tower foundations
Drainage systems, with installation of HDPE and RCP pipe, exfiltration trenches, trench drains, curb inlets, manholes, yard drains, and outfalls, plus removal and replacement of existing infrastructure
Water and fire systems, featuring 12”, 8”, and 6” DIP and PVC mains, tapping sleeves, backflow devices, hydrants, meters, valves, and fire service stub-outs
Sewer scope, including C-900 PVC mains, manholes, laterals, grease trap coordination, and bypass
FPL duct bank trenching and coordination, including concrete encasement and manhole installation
Concrete and paving work, including curbs, sidewalks, driveways, and lime rock base preparation for pavers and turf areas
Striping and signage, across all active scopes, including on-site and off-site improvements
Off-site infrastructure, along multiple city streets, with asphalt pavement, utility tie-ins, and stormwater systems per FDOT standards
Casa Familia.
Solution Construction provided full-site development for the Casa Familia affordable housing campus, delivering comprehensive civil work across both the Homes and Gardens sections in Phase 2 & 3.
-
Pinnacle Housing
-
10921 SW 84th Street Miami, FL 33173
-
Site preparation, including clearing, grubbing, and building pad elevation adjustments for both residential and communal structures
Asphalt paving, with sub-base preparation, lime rock placement, and milling/resurfacing where applicable
Drainage systems, including HDPE pipe, exfiltration trenches, roof drains, catch basins, curb inlets, and tie-ins to existing structures
Water distribution and fire lines, featuring 12”, 6”, 4”, and 2” DIP and HDPE, tapping sleeves, valves, meters, backflow preventers, hydrants, and domestic services
Sewer infrastructure, including PVC C-900 mains, laterals, clean-outs, manholes, and full tie-in to city utilities
Concrete infrastructure, including sidewalks, driveways, curbs, and dumpster pads with standard gray brush finish
Signage and striping, with ADA markings, stop bars, directional arrows, and one-way systems for resident traffic flow
Alternates, including demolition of existing site elements and sub-base import for areas requiring soil remediation
Laguna Gardens.
Solution Construction executed full-site civil infrastructure for the Laguna Gardens project in Miami Gardens, providing a complete underground utility package, structural prep, and surface restoration for this multi-building residential complex.
-
Cymbal DLT Companies
-
20775 NW 17th Ave, Miami Gardens, FL
-
Heavy-duty and standard asphalt pavement, with geogrid reinforcement, lime rock subgrade, and both regular and heavy-duty asphalt types across parking, fire lanes, and drive aisles
Extensive storm drainage systems, including HDPE pipe ranging from 8” to 24”, exfiltration trenches, manholes, catch basins, and mitered end sections
Domestic water and fire service infrastructure, with 2” to 12” DIP and PVC, dual meter boxes, hydrants, valves, RPZs, backflow devices, and full restoration of tie-ins
Sanitary sewer, with C-900 PVC, manholes, clean-outs, wyes, and connection to existing infrastructure after full demolition of outdated systems
Concrete scope, including sidewalks, dumpster pads, curbs, valley gutters, and full site grading with import fill and sub-base compaction
Striping and ADA signage, including all pavement markings, crosswalks, handicap stalls, and directional signage throughout the development
Lake remediation and backfill, with over 60,000 tons of imported rock fill to stabilize and prepare for future expansion
Site logistics and crane pads, with additional stabilization for equipment access
Nicklaus Children’s Health System.
Solution Construction led the civil infrastructure upgrade for the Nicklaus Children’s Health System Palmetto Bay Outpatient Center, focusing on the integration of new sewer systems and restoration of the surrounding site.
-
Nicklaus Children’s Health System
-
17615 SW 97 Ave. Palmetto Bay, FL 33157
-
Demolition and utility removal, including asphalt, sidewalk, brick pavers, pump station, manholes, and force main components
Deep sewer infrastructure installation, featuring 6” and 8” DIP laterals and mains, manholes, bends, wyes, and complete tie-ins to existing sewer systems
Drainage work, including new catch basins and connection to existing structures
Shoring, bypass pumping, dewatering, and over-excavation for deep trenching and confined area access
Concrete and hardscape restoration, with new curbs, sidewalks, crosswalks, and ADA-compliant markings
Surface restoration, including new asphalt base, lime rock, paving, and full striping/signage package
This project highlights our experience with complex underground sewer scopes in active healthcare environments, requiring precise excavation, traffic coordination, and fast-track surface restoration.
Other Projects.
-
BHS – Phase I North Entry
BHS Building B Sheer Wall Soft Dig
BHS – Helix & Parking Garage
BHSF Rehab Hospital and Garage (South Miami)
Broward Health FSED Enabling
Nicklaus Children’s Hospital (Palmetto Bay)
Boca Regional Hospital CEP
BRRH Meadows Road
BRRH Tower Package
-
Aman Hotel & Residences
Cipriani (1420 South Miami)
Vita at Grove Isle
Casa Familia – Gardens
Casa Familia – Residences
28 Star Island
1155 100 Street Apartments
9309 & 9317 Collins Ave (Surfside)
Nema Miami
Pinnacle 441
Pinnacle Las Olas
Old Cutler Village
-
2600 Biscayne
2900 Terrace
Hanover Riverwalk
Fat Village
Base Camp 305
Iron Mountain Data Centers
Live Nation
Slam Palm Beach
-
Miami Beach Convention Center
City of Miami Admin Building (COMAB)
Collins Park
Kane Concourse
Baywalk Pedestrian Bridge (South Beach)
MDC PRCC Community Center
-
Miami Dade College
Florida International University
University of Miami